Glenwood Rd SWRestrictedBetweenConstruction5/22/20179/1/2017South
SW JH Rd and SW Wildwood Rd
Significant delays of 10 minutes or more in the immediate vicinity of the work.  Flaggers will direct motorists through the work area.  Alternate routes advised if possible.

Sound Excavation is paving Monday through Wednesday, and is paving road approaches Thursday and Friday. This is the final phase of a project that widened the road, corrected the horizontal and vertical curves, and constructed drainage improvements. Traffic is restricted to one lane, and will follow a pilot car through the work areas. Expect significant delays of up to 15 minutes through this area. Alternate routes are strongly recommended.




Lakeway BoulevardRestrictedBetweenMaintenance8/21/20178/21/2017South
between Sidney Road to Bethel Burley Road
Short delays of up to 5 minutes in the immediate vicinity of the work. Flaggers will direct motorists through the work area.
Fog Sealing
NE West Kingston RoadClosedBetweenConstruction4/17/201712/31/2017North

​Siyaya Avenue NE and S Kingston Road

​Significant delays. A detour around the work area is in place. Alternate routes are advised if possible.

​A portion on NE West Kingston Road will close to all vehicle and pedestrian traffic on April 17, 2017 to make way for construction of a new 150-foot, two-span bridge across Carpenter Creek, replacing a narrow culvert. The road will be closed between Siyaya Avenue and South Kingston Road, and is expected to reopen in December 2017. Driveway access will be maintained for residents in the work zone.

Old Holly Hill Rd NWClosedAt the intersection withConstruction7/25/201712/29/2017Central

​Seabeck Holly Rd NW

​Significant delays. A detour around the work area is in place. Alternate routes are advised if possible.

Old Holly Hill Rd NW is closed to all vehicle and pedestrian traffic in support of the replacement of the Seabeck Holly Road Bridge #20 at Anderson Creek.  A concrete girder bridge will replace the existing timber bridge.  The contractor, Pacific Pile and Marine, anticipates completion in December 2017.

Seabeck Holly Rd NWRestrictedAt the intersection withConstruction7/25/201712/29/2017Central

Old Holly Hill Rd NW​

​Moderate delays of 5-10 minutes in the immediate vicinity of the work.

Seabeck Holly Rd NW, southwest of Old Holly Hill Rd NW, is restricted to one lane for the replacement of the Seabeck Holly Road Bridge #20 at Anderson Creek.  A concrete girder bridge will replace the existing timber bridge.  The contractor, Pacific Pile and Marine, anticipates completion in December 2017.

Silverdale Way NWRestrictedBetweenConstruction8/7/20179/28/2018Central
From 600 feet south of the intersection with Byron Street to Anderson Hill Road
Short delays of up to 5 minutes in the immediate vicinity of the work. Flaggers will direct motorists through the work area.
Ceccanit Inc. began construction on the Silverdale Way Improvement Project on Monday August 7. It is anticipated that delays to the public will be minimal at the beginning as they mobilize on-site. This project continues through September 2018. Additional information on this project is available at: http://kitsap.paladinpanoramic.com/project/2232/54723
Sunset AveClosedBetweenConstruction7/10/20178/31/2017Central

​Sunset Ave NE between NE Arrowhead Rd and NE McWilliams Rd

​One-way flagged traffic on Monday, July 10th. Road closure will start on Tuesday, July 11.

​Sewer upgrades. One-way flagged traffic will be used when possible. Work hour window will be 7:00 am to 6:00 pm. Road closures will be day time closures not to exceed 11 hours/day. Normal working hours will be 10 hours/day, 4 days/week, M-Thur.

Washington Boulevard NERestrictedBetweenMaintenance1/1/2017North
4th St NE and end of maintenence.

10,000 pound weight restriction in place

Road is gravel in places and restricted to one lane. 10,000 pound weight restriction is in effect.